Middle Palas Valley HydroPower Project

Middle Palas Valley HydroPower Project

Middle PalasLocation: Palas Valley (Chor Nullah) is located on the left bank of the Indus river with influence 8km upstream of Patan Town in Kohistan District, Khyber Pakhtunkhwa. The project has been planned on the left bank of Palas Velly with powerhouse, 25km from Patan Town and 335 km from Islamabad.
Salient Features
Generation Capacity  398 MW
Gross Head 685 M
Rated Net Head 649 M
Design Discharge 71 m3/Sec
Mean Annual Energy 1,716 GWh
No. & Type of Turbine  3, Pelton
Type Of Dam CFRD
Height Of Dam 81 M
Head Race Tunnel 10.6 Km
Pressure Shaft 1000 m
Construction Period 5 Years
Estimated Project Cost 521 Million US$

Status

  •  Pre-feasibility study has been completed in year 2008.