Upper Spat Gah HydroPower Project

Upper Spat Gah HydroPower Project

 Location SPAT GAHSpat Gah is the left bank tributary of Indus River with its confluence 8 km downstream of Dasu town in Kohistan District, Khyber Pakhtunkhawa. The project layout has been planned on the left bank with powerhouse 36 km from Dasu and 398 km from Islamabad.
Salient Features
Installed Capacity 252MW
Gross Head 465 M
Rated Net Head 401 M
Design Discharge 75 m3/sec
Mean Annual Energy 1063 GWH
No. & Type of Turbine 3, Pelton
Type of Dam  CFRD
Height of Dam  140M
Headrace Tunnel  15.9 km
Pressure Shaft  500 M
Construction Period  05 Years
Estimated Project Cost  863 Million US $

 

Status

  • A pre-feasibility study was completed in the year 2008.

In charge of the Project
Engr. Nazakat Hussain
General Manager (Hydro) Planning
Contact No. 0092-42-99202717

Read 23316 times