Middle Spat Gah HydroPower Project

 

 Location SPAT GAHMiddle Spat Gah is located on Gabarband Gah, a right bank tributary of Spat Gah with confluence 8 km downstream of Dasu town in Kohistan District, Khyber Pakhtunkhawa. The project layout has been planned on the left bank with a powerhouse 22 km from Dasu and 384 km from Islamabad.
Salient Features
Installed Capacity  489 MW
Gross Head  775 M
Rated Net Head  707 M
Design Discharge  82 m3/sec
Mean Annual Energy  1895 GWH
No. & Type of Turbine  3, Pelton
Type of Dam  CFRD
Height of Dam  94 M
Headrace Tunnel  6.4 km
Pressure Shaft  1100 M
Construction Period  05 Years
Estimated Project Cost  682 Million US$

 

Status

  • A pre-feasibility study has been completed in the year 2008.

In charge of the Project
Engr. Nazakat Hussain
General Manager (Hydro) Planning
Contact No. 0092-42-99202717