Phandar HydroPower Project

Phandar HydroPower Project

Location
On Ghizer River near Phandar Lake to Chhashi Gol, 160 km North-West of Gilgit-Chitral Road and 772 km from Islamabad. 
Salient Features
  • Installed Capacity
80 MW  phandar
  • Annual Energy
374 GWh                               
  • Objectives
To Generate Electricity

Scope of Work

Construction of  Project including 170 km Transmission Line
Consultants A JV of FHC Consulting Engineers (Lead Firm), Techno Consult, Electra Consultants In Association with Scott Wilson Limited, UK.
Contractor -
Commencement Date -
Completion Date -
Financial Status (Rs. Million) Local Foreign Total
Approved PC-II Cost (30.04.2007) 120.370 - 120.370
PSDP Allocation 2019-2020 - - -

Status:-

• Detailed Engineering Design & Preparation of Tender Document of the project was completed in 2013.
• Updated PC-I amounting to Rs. 17,251.50 Million has been prepared by incorporating Confidence Building Measures and Security Cost as per directives of Ministry.
• Project would be taken up after arrangement of financing from donor agencies/Gilgit Baltistan Govt. and PC-I will be submitted accordingly.
• “Public Hearing” for issuance of NOC by GB-EPA on EIA report was held on 25.07.2015 at Phandar project site. Issues raised in Public Hearing are related to GB Government. NOC for environmental study from GB-EPA is awaited.
• WAPDA will implement the project as a deposit work, whereas GB Govt. will be sponsoring agency.

In charge of the Project
Engr. Nazakat Hussain
General Manager (Hydro) Planning