The Project is proposed across Kaha Nullah at about 116 km West of District Rajanpur.
Salient Features
  • Type of Dam

Earth Core Rock Fill  
  • Height of Dam

351 ft.
  • Gross Storage

0.80 MAF
  • Live Storage

0.60 MAF
  • GCA  

120,000 Acres
  • Power Generation

12 MW

Scope of Work

Feasibility Study, Detailed Engineering Design and Preparation of Tender Documents

Execution by

WAPDA

Donor Agency

Govt. of Pakistan

Commencement Date

-

Completion Date

-

Financial Status (Rs. Million)

Local Foreign Total

Approved PC-I Cost (03.09.2009)

349.956 - 349.956

PSDP Allocation for 2022-2023

127.117 - 127.117

Status:-

  • Contract Agreement signed between WAPDA and M/s NESPAK-JV on 20.05.2020.
  • Topographic Survey of Darrah site (Barrage Site), Mud Kund site (Dam site) and reservoir area completed.
  • Geotechnical investigations & Geological mapping at Darrah site completed.
  • Geotechnical investigations & Geological mapping at Mud Kund site in progress.
  • Flow & sediments measurements at Darrah Site are being carried out by SWHP, WAPDA.
  • Collection of soil and water samples from command area has been completed.
  • The Consultants have surveyed for barrow areas for riprap, scoarse & fine aggregates and further investigation are in progress.
  • Environmental survey in project area for preparation of Environmental Impact Assessment (EIA) report is in Progress.
  • Installation of Automatic Stage Recorder (ASR) is in process.
  • Consultants have submitted Draft Feasibility Report.
  • Comments by WAPDA on Draft Feasibility report are in process.

Flood Damages
The sensor of Automatic Stage Recorder (ASR) installed in project area has been washed away by the flood on 14.08.2022. Installation of new sensor is under process.

Progress of Study 82 %

In charge of the Project
Engr. Nazakat Hussain
General Manager (Hydro) Planning
Contact No. 0092-42-99202717

 

Read 13240 times