Upper Chenab Canal

nandipur powerinside

Upper Chenab Canal takes-off from the River Chenab at Marala Head Works with full discharge capacity of 16000 cusecs.

At Bombanwala Head Works, UCC bifurcates as Bombanwala-Ravi-Bedian (B.R.B) mainly a carrier channel to feed Lower Bari Doab (L.B.D) taking off from River Ravi at Balloki Headworks.


In Pictures

nandipur
Image Detail
nandipur
Image Detail
nandipur
Image Detail
nandipur
Image Detail
nandipur
Image Detail
nandipur
Image Detail

 

 

 

 

 

Read 40722 times