E&M Equipment of Tarbela

E&M Equipment of Tarbela

Turbine           

 

Units

(1~4)

(5~8)

(9~10)

(11~14)

Turbines Make

Hitachi Japan

DEW Canada

DBS Canada

DBS/SEW Canada

Type

Vertical Frances

Vertical Frances

Vertical Frances

Vertical Frances

Rated Output (BHP)

275,000 / 239,000

275,000 / 239,000

275,000 / 239,000

596,000

DesignedHead (FT)

270

333

333

270

Rated Head (FT)

378

378

378

385

Speed (RPM)

136.4

136.4

136.4

90.9

Rated Discharge for one unit (CFS)

6700

6700

6700

15000

Generators

Units

(1~4)

(5~8)

(9~10)

(11~14)

Generators Make

Hitachi Japan

CGE Canada

Hitachi Japan

Siemens Germany

Type

Semi Umbrella

Rated Capacity (MW)

175

175

175

432

Power Factor

0.85

0.95

0.95

0.90

Rated Voltage

13.8

13.8

13.8

18

Speed (RPM)

136.4

136.4

136.4

90.9

Overload Capacity

115%

115%

115%

-

Power Transformer

Units

(1~4)

(5~8)

(9~10)

(11~14)

Capability (MVA/Phase)

79

71

71

160

Voltage Ration (KV)

13.2 /220

13.2 /500

13.2 /500

25.0 /500

Make

Jeumont Schneider France

ASEA Canada/ Hitachi Jap/
TBEA China

Hitachi Japan

Ansaldo Italy

 

In Pictures

Tarbela (Spillw...
Image Detail
Tarbela Dam
Image Detail
Tarbela Dam
Image Detail
Tarbela Dam
Image Detail
Tarbela Dam
Image Detail
Tarbela Switch ...
Image Detail
Tarbela Dam
Image Detail
Tarbela Dam
Image Detail
Tarbela Dam
Image Detail
Tarbela Dam
Image Detail

Read 46648 times