News & Views

WAPDA News

PARADIGM SHIFT NEEDED IN DEVELOPMENT MECHANISM: WAPDA CHAIRMAN

April 01, 2019: A delegation of the Command and Staff College Quetta today visited WAPDA House Lahore. During the visit, the delegation was briefed about the water scenario and development projects of WAPDA in water and hydropower sectors.
Pic 1 04

Read more: PARADIGM SHIFT NEEDED IN DEVELOPMENT MECHANISM:...

NEELUM JHEULM ATTAINS FULL GENERATION CAPACITY OF 969 MW, AS WATER FLOWS IMPROVE WITH ONSET OF SUMMER

March 29, 2019: As the water flows increase with onset of summer, Neelum Jhelum Hydropower Project attained again today its maximum generation capacity of 969 MW with all four generating units of the project running on full load i.e. 242.25 MW each.
NJHP 01 04

Read more: NEELUM JHEULM ATTAINS FULL GENERATION CAPACITY...

WAPDA awards contract for Mohmand Dam

Mohmand 26 3 19 800x379

Read more: WAPDA awards contract for Mohmand Dam

WORLD WATER DAY ON MARCH 22 WAPDA PLANS TO ADD 10 MAF WATER STORAGE BY 2030

M 1

March 21, 2019: As the comity of nations is all set to celebrate ‘World Water Day’ on March 22 to create awareness about conservation and prudent use of water, the Pakistan Water and Power Development Authority (WAPDA) has been expeditiously working on a number of projects to improve water situation in order to avert looming water crisis in the country. For optimal utilization of water resources, WAPDA has devised a comprehensive strategy, through which various projects will be completed in a phased manner under short, medium and long term plans.

Read more: WORLD WATER DAY ON MARCH 22 WAPDA PLANS TO ADD...

President Islamic Republic of Pakistan Dr. Arif Alvi being briefed by Chairman WAPDA Lt Gen Muzammil Hussain (Retd)

President Islamic Republic of Pakistan Dr. Arif Alvi being briefed by Chairman WAPDA Lt Gen Muzammil Hussain (Retd) about water and hydropower projects on March 19, 2019

President Briefed by C

Subcategories